utilizing primarily
Electric-line or in some cases combining electric-line with
Coil tubing.
Mechanical profile control involves the total or partial isolation of an identified interval with excessive water or gas production (where gas production is not desired).
The Through-tubing plug-back or isolation and water conformance systems utilized for isolation projects in the Niger-delta include:
|